CAROLYN WESTON BLV over FRENCH CAMP SLOUGH

0.7 MI WEST OF MANTHEY RD · County 077, California · Built 1997 · 6 Lanes · 16,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
29C0407
Year Built
1997
Length
107.3 m (352 ft)
Max Span
45.1 m
Width
23.7 m (77.8 ft)
Lanes
6
Daily Traffic
16,700
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.