INTERSTATE 5 NB over WALKER SLOUGH
10-SJ-005-R23.93-STKN · County 077, California · Built 1971 · 4 Lanes · 43,750 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.916894, -121.291117
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
MANTHEY ROAD over WALKER SLOUGH
Built 1971
INTERSTATE 5 SB over WALKER SLOUGH
Built 1971
TURNPIKE RD over WALKER SLOUGH
Built 1971
INTERSTATE 5 NB over DOWNING AVENUE
Built 1971
INTERSTATE 5 SB over DOWNING AVENUE
Built 1971
CAROLYN WESTON BLV over FRENCH CAMP SLOUGH
Built 1997
ODELL AVENUE over WALKER SLOUGH
Built 1970
INTERSTATE 5 NB over FRENCH CAMP SLOUGH
Built 1971
INTERSTATE 5 SB over FRENCH CAMP SLOUGH
Built 1971
INTERSTATE 5 over EIGHTH STREET
Built 1971
Bridge Details
- Structure #
- 29 0223R
- Year Built
- 1971
- Length
- 36 m (118.1 ft)
- Max Span
- 7.9 m
- Width
- 19.2 m (63 ft)
- Lanes
- 4
- Daily Traffic
- 43,750
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.