DRAIS ROAD over SOUTH BRANCH DUCK CREEK

STATE HIGHWAY 4 · County 077, California · Built 1961 · 2 Lanes · 231 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
29C0350
Year Built
1961
Length
17.4 m (57.1 ft)
Max Span
6.7 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
231
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.