HOLLENBECK over DUCK CREEK

0.1 MI N OF SH 4 · County 077, California · Built 1968 · 2 Lanes · 68 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
29C0344
Year Built
1968
Length
21.9 m (71.9 ft)
Max Span
8.5 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
68
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.