PERSHING AVE over SMITH CANAL

JUST NORTH HARDING WAY · County 077, California · Built 1952 · 4 Lanes · 29,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
29C0242
Year Built
1952
Length
43.9 m (144 ft)
Max Span
8.5 m
Width
18.1 m (59.4 ft)
Lanes
4
Daily Traffic
29,100
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.