LOWER SACTO RD over MOSHER SLOUGH
N. OF MACDUFF AVE · County 077, California · Built 1972 · 4 Lanes · 19,600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
38.028208, -121.322828
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
SANTA PAULA WAY over MOSHER SLOUGH
Built 1972
EL DORADO ST over MOSHER SLOUGH
Built 1969
THORNTON ROAD over MOSHER SLOUGH
Built 1931
LOWER SACTO RD over BEAR CREEK
Built 1963
DAVIS ROAD over BEAR CREEK
Built 1963
TAM OSHANTER DR over MOSHER SLOUGH
Built 1981
DON AVE over MOSHER SLOUGH
Built 1976
WEST LANE over MOSHER SLOUGH
Built 1966
LOWER SACRAMENTO R over WINEDRAW SLOUGH
Built 1957
THORNTON ROAD over BEAR CREEK
Built 1960
Bridge Details
- Structure #
- 29C0134
- Year Built
- 1972
- Length
- 20.1 m (65.9 ft)
- Max Span
- 9.8 m
- Width
- 32.3 m (106 ft)
- Lanes
- 4
- Daily Traffic
- 19,600
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $650,000
- Total Project Cost
- $1,092,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.