DON AVE over MOSHER SLOUGH
0.1 MI S WAUDMAN AVE · County 077, California · Built 1976 · 2 Lanes · 10,641 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
38.028411, -121.345517
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 50 years old.
Nearby Bridges
THORNTON ROAD over MOSHER SLOUGH
Built 1931
INTERSTATE 5 NB over W HAMMER LANE
Built 1970
INTERSTATE 5 SB over W HAMMER LANE
Built 1970
KELLEY ROAD over MOSHER SLOUGH
Built 1980
THORNTON ROAD over BEAR CREEK
Built 1960
INTERSTATE 5 NB over MOSHER SLOUGH
Built 1975
INTERSTATE 5 SB over MOSHER SLOUGH
Built 1975
MARINERS DR over MOSHER SLOUGH
Built 1975
INTERSTATE 5 over FIVE MILE SLOUGH
Built 1970
LOWER SACTO RD over MOSHER SLOUGH
Built 1972
Bridge Details
- Structure #
- 29C0096
- Year Built
- 1976
- Length
- 21.6 m (70.9 ft)
- Max Span
- 10.4 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,641
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $321,000
- Total Project Cost
- $540,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.