INTERSTATE 5 NB over MICHIGAN AVE

10-SJ-005-28.75 · County 077, California · Built 1970 · 8 Lanes · 124,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
29 0190
Year Built
1970
Reconstructed
2016
Length
30.5 m (100.1 ft)
Max Span
30.3 m
Width
46.9 m (153.9 ft)
Lanes
8
Daily Traffic
124,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.