PITTSB-ANTIOCH HWY over KIRKER CREEK

0.6 MI E OF HARBOR ST · County 013, California · Built 1950 · 2 Lanes · 10,610 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
28C0496
Year Built
1950
Reconstructed
2005
Length
8.5 m (27.9 ft)
Max Span
4.1 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
10,610
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.