STATE ROUTE 4 over MAINTENANCE ACCESS

04-CC-004-24.97-ANT · County 013, California · Built 1953 · 10 Lanes · 114,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
28 0105
Year Built
1953
Reconstructed
2013
Length
11.1 m (36.4 ft)
Max Span
11.1 m
Width
58.8 m (192.9 ft)
Lanes
10
Daily Traffic
114,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.