FIRST ST over RODEO CREEK

EAST OF SOUTH H ST · County 013, California · Built 1965 · 2 Lanes · 440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
28C0380
Year Built
1965
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
440
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.