INTERSTATE 80 over WILLOW AVENUE
04-CC-080-10.69-HER · County 013, California · Built 1958 · 8 Lanes · 115,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
38.022642, -122.262367
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 68 years old.
Nearby Bridges
INTERSTATE 80 over RODEO CREEK
Built 1958
E80-WILLOW OFF&ON over RODEO CREEK
Built 1958
E80-WILLOW AVENUE over WILLOW AVENUE
Built 2010
HAWTHORNE DR over RODEO CREEK
Built 1959
VIEWPOINTE BLVD over RODEO CREEK
Built 1974
7TH ST over RODEO CREEK
Built 1982
CALIFORNIA STREET over INTERSTATE 80
Built 2006
W4-W80 CONNECTOR over STATE ROUTE 4
Built 1958
INTERSTATE 80 over STATE ROUTE 4 & RAMPS
Built 1958
E4-E80 CONNECTOR over STATE ROUTE 4
Built 1958
Bridge Details
- Structure #
- 28 0151
- Year Built
- 1958
- Reconstructed
- 2008
- Length
- 50.2 m (164.7 ft)
- Max Span
- 20.4 m
- Width
- 36.1 m (118.4 ft)
- Lanes
- 8
- Daily Traffic
- 115,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,888,000
- Total Project Cost
- $3,171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.