LOVERIDGE ROAD over CONTRA COSTA CANAL
0.2 MI N BUCHANAN RD · County 013, California · Built 1970 · 4 Lanes · 1,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.000197, -121.873828
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 56 years old.
Nearby Bridges
HARBOR ST over CONTRA COSTA CANAL
Built 1966
HARBOR ST over KIRKER CREEK
Built 1968
LOVERIDGE ROAD over STATE ROUTE 4
Built 2014
RAILROAD AVE over CONTRA COSTA CANAL
Built 1938
STATE ROUTE 4 EB over CENTURY BLVD
Built 2013
STATE ROUTE 4 over MAINTENANCE ACCESS
Built 1953
STATE ROUTE 4 WB over CENTURY BLVD
Built 2013
HARBOR STREET over STATE ROUTE 4
Built 2003
PITTSB-ANTIOCH HWY over KIRKER CREEK
Built 2005
BUCHANAN RD over CONTRA COSTA CANAL
Built 1938
Bridge Details
- Structure #
- 28C0285
- Year Built
- 1970
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 28.5 m (93.5 ft)
- Lanes
- 4
- Daily Traffic
- 1,500
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.