DEL MONTE DR over BNSF RY
0.1 MI N SAN PABLO AVE · County 013, California · Built 1965 · 2 Lanes · 3,124 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.0037, -122.317597
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 61 years old.
Nearby Bridges
SAN PABLO AVE over GARRITY CREEK
Built 1924
SAN PABLO AVE over MCCARTHY CREEK
Built 1969
APPIAN WAY SB over INTERSTATE 80
Built 1957
APPIAN WAY NB over INTERSTATE 80
Built 1985
RICHMOND PARKWAY over INTERSTATE 80
Built 1997
SAN PABLO AVE over PINOLE CREEK
Built 1929
TENNENT AVE over PINOLE CREEK
Built 1967
HENRY AVENUE over PINOLE CREEK
Built 1986
INTERSTATE 80 over PINOLE CREEK
Built 1957
SAN PABLO AVE over BNSF RY AND AMTRAK
Built 1938
Bridge Details
- Structure #
- 28C0207
- Year Built
- 1965
- Reconstructed
- 2003
- Length
- 41.8 m (137.1 ft)
- Max Span
- 13.7 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,124
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,115,000
- Total Project Cost
- $1,874,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.