W580-CENTRAL OFF over CENTRAL AVE

04-CC-580-0.04-RCH · County 013, California · Built 1991 · 1 Lanes · 4,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
28 0231J
Year Built
1991
Length
137 m (449.5 ft)
Max Span
9.1 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
4,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,069,000
Total Project Cost
$1,795,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.