I80 JACUZZI PIERCE over CERRITO CREEK

04-CC-080-0.01-RCH · County 013, California · Built 1936 · 8 Lanes · 179,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
28 0136
Year Built
1936
Reconstructed
1960
Length
9.4 m (30.8 ft)
Max Span
3 m
Width
64.3 m (211 ft)
Lanes
8
Daily Traffic
179,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.