US HIGHWAY 50 WB over RED HAWK PKWY-E50 ONRAMP

03-ED-050-R11.25 · County 017, California · Built 2009 · 2 Lanes · 23,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
25 0120L
Year Built
2009
Length
40.3 m (132.2 ft)
Max Span
38.1 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
23,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.