RED HAWK PKWY RAMP over US HIGHWAY 50 & RAMPS

03-ED-050-R11.20 · County 017, California · Built 2009 · 1 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
25 0119S
Year Built
2009
Length
237.6 m (779.5 ft)
Max Span
64.4 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
10,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.