RIO LINDA BLVD over NORTH CHANNEL DRY CREEK

0.8 MI S OF ELKHORN BLVD · County 067, California · Built 2019 · 2 Lanes · 15,152 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24C0634
Year Built
2019
Length
20.1 m (65.9 ft)
Max Span
11.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
15,152
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.