2ND STREET CONNECT over 2ND STREET

AT CAPITOL MALL OC · County 067, California · Built 2016 · 2 Lanes · 16,491 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24C0610
Year Built
2016
Length
88.7 m (291 ft)
Max Span
17.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
16,491
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.