NORTH BEND DRIVE over EAST DRAINAGE CANAL

EAST OF NATOMAS BLVD · County 067, California · Built 2005 · 3 Lanes · 5,649 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
24C0597
Year Built
2005
Length
36.3 m (119.1 ft)
Max Span
13.4 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
5,649
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.