6TH STREET over F STREET

SACRAMENTO RAIL YARDS · County 067, California · Built 2010 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24C0544
Year Built
2010
Length
19.8 m (65 ft)
Max Span
18.9 m
Width
24.4 m (80.1 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.