HURLEY WAY over CHICKEN RANCH SLOUGH

340 FT E/O ETHAN WAY · County 067, California · Built 1967 · 4 Lanes · 20,329 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
24C0472
Year Built
1967
Length
6.3 m (20.7 ft)
Max Span
3.1 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
20,329
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.