SYLVAN ROAD over SAN JUAN CREEK

0.4 MI N GREENBACK LANE · County 067, California · Built 1967 · 4 Lanes · 27,244 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
24C0410
Year Built
1967
Length
7 m (23 ft)
Max Span
3.4 m
Width
28.6 m (93.8 ft)
Lanes
4
Daily Traffic
27,244
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.