EL CAMINO AVE over CHICKEN RANCH SLOUGH
0.25 MI W FULTON AVE · County 067, California · Built 1940 · 4 Lanes · 25,101 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.610719, -121.4055
This bridge is in worse condition than 21% of bridges in County 067. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
HERNANDO RD over CHICKEN RANCH SLOUGH
Built 1940
BELL ST over CHICKEN RANCH SLOUGH
Built 1971
COTTAGE WAY over CHICKEN RANCH SLOUGH
Built 1965
WYDA WAY over CHICKEN RANCH SLOUGH
Built 1976
ALTA ARDEN over STRONG RANCH SLOUGH
Built 1972
ARMSTRONG DR over STRONG RANCH SLOUGH
Built 1960
ALTA ARDEN over CHICKEN RANCH SLOUGH
Built 1972
MARCONI AVE over STATE ROUTE 51
Built 1947
BUTANO DR over STRONG RANCH SLOUGH
Built 1975
ARDEN WAY over CHICKEN RANCH SLOUGH
Built 1965
Bridge Details
- Structure #
- 24C0206
- Year Built
- 1940
- Reconstructed
- 1960
- Length
- 9.1 m (29.9 ft)
- Max Span
- 3 m
- Width
- 25.9 m (85 ft)
- Lanes
- 4
- Daily Traffic
- 25,101
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.