WILTON RD over COSUMNES RIVER
1.5 MI E GRANT LINE RD · County 067, California · Built 1957 · 2 Lanes · 11,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.416739, -121.279864
This bridge is in worse condition than 21% of bridges in County 067. The average bridge in California is 0 years old; this one is 69 years old.
Nearby Bridges
WILTON RD over DEER CREEK
Built 1957
GRANT LINE RD over DRAINAGE CANAL
Built 1960
GRANT LINE RD over EAST BRANCH LAGUNA CREEK
Built 1939
EXCELSIOR RD over LAGUNA CREEK TRIBUTARY 1
Built 1980
BRADSHAW RD over LAGUNA CREEK TRIBUTARY 4
Built 1980
BADER RD over EAST BRANCH LAGUNA CREEK
Built 1986
SALMON CREEK DR over LAGUNA CREEK TRIBUTARY 4
Built 2003
BRADSHAW & SHELDON over LAGUNA CREEK EAST BRANCH
Built 2018
STONEBROOK DR over LAGUNA CREEK TRIBUTARY 4
Built 1998
DILLARD RD over PASTURE CREEK
Built 1961
Bridge Details
- Structure #
- 24C0037
- Year Built
- 1957
- Length
- 125.1 m (410.4 ft)
- Max Span
- 15.2 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 11,400
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.