GRANT LINE ROAD over STATE ROUTE 99
03-SAC-099-10.07-ELKG · County 067, California · Built 2009 · 7 Lanes · 1,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.376097, -121.36225
This bridge is in worse condition than 76.8% of bridges in County 067. The average bridge in California is 0 years old; this one is 17 years old.
Nearby Bridges
GRANT LINE RD over UNION PACIFIC RAILROAD
Built 2015
STATE ROUTE 99 over UP RR BNSF RY & AMTRAK
Built 2022
FALCON MEADOW DR over ELK GROVE CREEK
Built 1981
STATE ROUTE 99 over CONSUMNES RIVER
Built 2022
WYLAND DRIVE over ELK GROVE CREEK
Built 2021
ELK GRVE-FLORIN RD over ELK GROVE CREEK
Built 1976
STATE ROUTE 99 over CONSUMNES RIVER OVERFLOW
Built 2022
ELK GROVE BLVD over ELK GROVE CREEK
Built 1976
CARINATA DR over SHED B CHANNL (FRANKLIN)
Built 2008
STATE ROUTE 99 SB over COSUMNES RIVER OVERFLOW
Built 1958
Bridge Details
- Structure #
- 24 0367
- Year Built
- 2009
- Length
- 81.5 m (267.4 ft)
- Max Span
- 41 m
- Width
- 42.6 m (139.8 ft)
- Lanes
- 7
- Daily Traffic
- 1,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.