U.S. HIGHWAY 50 over UP BNSF SCRTDLRT REDDING

03-SAC-050-R2.88-SAC · County 067, California · Built 1971 · 5 Lanes · 115,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
24 0289R
Year Built
1971
Length
213.3 m (699.8 ft)
Max Span
46.6 m
Width
23.8 m (78.1 ft)
Lanes
5
Daily Traffic
115,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.