INTERSTATE 5 NB over LOST SLOUGH

03-SAC-005-1.04 · County 067, California · Built 1979 · 2 Lanes · 26,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24 0261R
Year Built
1979
Length
283.3 m (929.5 ft)
Max Span
18.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
26,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.