WEST EL CAMINO AVE over INTERSTATE 5
03-SAC-005-25.97-SAC · County 067, California · Built 1968 · 4 Lanes · 18,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.614822, -121.512128
This bridge is in worse condition than 21% of bridges in County 067. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
W EL CAMINO AVE over NATOMAS MAIN CANAL
Built 2003
INTERSTATE 5 SB over INTERSTATE 80
Built 1968
INTERSTATE 5 NB over INTERSTATE 80
Built 1968
W80-S5 CONNECTOR over INTERSTATE 80
Built 1970
INTERSTATE 5 SB over W80-S5 CONNECTOR RAMP
Built 1968
INTERSTATE 5 NB over W80-S5 CONNECTOR RAMP
Built 1968
DISCOVERY PK RD over NATOMAS EAST MAIN DRAIN
Built 1970
INTERSTATE 80 over NATOMAS MAIN CANAL
Built 1970
SAN JUAN ROAD over INTERSTATE 80
Built 1970
SAN JUAN RD over EAST DRAINAGE CANAL
Built 1965
Bridge Details
- Structure #
- 24 0238
- Year Built
- 1968
- Length
- 71 m (232.9 ft)
- Max Span
- 37.5 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 18,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.