WEST EL CAMINO AVE over INTERSTATE 5

03-SAC-005-25.97-SAC · County 067, California · Built 1968 · 4 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
24 0238
Year Built
1968
Length
71 m (232.9 ft)
Max Span
37.5 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
18,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.