US HIGHWAY 50 over BIKE PATH

03-SAC-050-12.85 · County 067, California · Built 1962 · 9 Lanes · 121,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
24 0171
Year Built
1962
Reconstructed
2000
Length
38.1 m (125 ft)
Max Span
14.9 m
Width
47.2 m (154.9 ft)
Lanes
9
Daily Traffic
121,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.