OLIVE SCHOOL LANE over MC CUNE CREEK

2.0 MILE S PUTAH CREEK · County 095, California · Built 1997 · 2 Lanes · 225 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
23C0202
Year Built
1997
Length
8.2 m (26.9 ft)
Max Span
7.7 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
225
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.