INTERSTATE 505 over DRY ARROYO

04-SOL-505-R7.50 · County 095, California · Built 1960 · 4 Lanes · 22,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
23 0031
Year Built
1960
Reconstructed
1974
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
4
Daily Traffic
22,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.