INTERSTATE 80 over YOLO CAUSEWAY EAST

03-YOL-080-7.25 · County 113, California · Built 1963 · 6 Lanes · 135,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
22 0045
Year Built
1963
Reconstructed
1986
Length
2682.2 m (8799.9 ft)
Max Span
12.2 m
Width
40.7 m (133.5 ft)
Lanes
6
Daily Traffic
135,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.