INTERSTATE 80 EB over U.S. HIGHWAY 50 (I-305)

03-YOL-080-R9.86-WSAC · County 113, California · Built 1969 · 2 Lanes · 70,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
22 0140R
Year Built
1969
Length
121.6 m (399 ft)
Max Span
47.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
70,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.