MOUNT VEEDER ROAD over PICKLE CREEK

2.1 MILES N OF REDWOOD RD · County 055, California · Built 2020 · 2 Lanes · 737 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21C0145
Year Built
2020
Length
7.6 m (24.9 ft)
Max Span
5.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
737
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.