STATE ROUTE 29 over DRY CREEK

04-NAP-029-16.48 · County 055, California · Built 1970 · 4 Lanes · 43,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
21 0014
Year Built
1970
Reconstructed
1997
Length
26.7 m (87.6 ft)
Max Span
12.8 m
Width
29.8 m (97.8 ft)
Lanes
4
Daily Traffic
43,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.