WINE COUNTRY AVE over NAPA DRAIN
AT SOLANO AVE · County 055, California · Built 1960 · 2 Lanes · 3,853 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
38.336025, -122.322044
This bridge is in worse condition than 16.3% of bridges in County 055. The average bridge in California is 0 years old; this one is 66 years old.
Nearby Bridges
ST RTE 29 BYWAY E over CRAIG CREEK
Built 1958
JEFFERSON ST over NAPA DRAIN
Built 1991
TROWER AVE over NAPA DRAIN
Built 1970
TRANCAS ST-REDWOOD over STATE ROUTE 29
Built 2003
REDWOOD ROAD over REDWOOD CREEK
Built 1982
VILLA LANE over SILVERADO CREEK
Built 1999
WEST PUEBLO AVE over REDWOOD CREEK
Built 1970
BIG RANCH ROAD over SALVADOR OVERFLOW
Built 1988
WASHINGTON ST over DRY CREEK
Built 1970
STATE ROUTE 29 over DRY CREEK
Built 1970
Bridge Details
- Structure #
- 21C0111
- Year Built
- 1960
- Reconstructed
- 2016
- Length
- 7 m (23 ft)
- Max Span
- 3.4 m
- Width
- 21.8 m (71.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,853
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.