STATE ROUTE 29 over NVRR NAPA RIVER STANLY

04-NAP-029-R6.99 · County 055, California · Built 1977 · 4 Lanes · 48,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
21 0049
Year Built
1977
Length
679.7 m (2230 ft)
Max Span
76.2 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
48,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,087,000
Total Project Cost
$23,666,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.