RIVER RD over HILLSIDE

0.3 MI E/O CANYON 7 RD. · County 097, California · Built 1971 · 2 Lanes · 10,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20C0103
Year Built
1971
Length
66.8 m (219.2 ft)
Max Span
8.3 m
Width
5.5 m (18 ft)
Lanes
2
Daily Traffic
10,300
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.