LAUGHLIN RD over FIFE CREEK

0.1 MI W ARMSTRONG WDS RD · County 097, California · Built 1956 · 2 Lanes · 602 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
20C0044
Year Built
1956
Length
10.1 m (33.1 ft)
Max Span
9.7 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
602
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.