STATE ROUTE 267 over MARTIS CREEK
03-PLA-267-2.04 · County 061, California · Built 1971 · 2 Lanes · 11,600 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.302606, -120.120739
This bridge is in worse condition than 47% of bridges in County 061. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
HOPE COURT over PINYON CREEK
Built 2004
STATE ROUTE 267 over GLENSHIRE RR TRK RIVER
Built 2003
GLENSHIRE DR over UP BNSF AMTRAK TRUCKEE R
Built 1999
INTERSTATE 80 EB over STATE ROUTE 267
Built 2002
INTERSTATE 80 WB over STATE ROUTE 267
Built 2002
INTERSTATE 80 over FIBREBOARD
Built 2004
STATE ROUTE 89 over INTERSTATE 80
Built 1995
BROCKWAY ROAD over TRUCKEE RIVER
Built 1993
DONNER PASS ROAD over TROUT CREEK
Built 2006
EDWIN ROAD over DRAINAGE DITCH
Built 2007
Bridge Details
- Structure #
- 19 0133
- Year Built
- 1971
- Length
- 9.4 m (30.8 ft)
- Max Span
- 3.7 m
- Lanes
- 2
- Daily Traffic
- 11,600
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.