INTERSTATE 80 WB over STATE ROUTE 267

03-NEV-080-16.60-TRK · County 057, California · Built 2002 · 2 Lanes · 14,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
17 0099L
Year Built
2002
Length
68.4 m (224.4 ft)
Max Span
33.5 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
14,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.