INTERSTATE 80 EB over KINGVALE ROAD
03-PLA-080-69.23 · County 061, California · Built 1959 · 2 Lanes · 13,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
39.314022, -120.445614
This bridge is in worse condition than 95.4% of bridges in County 061. The average bridge in California is 0 years old; this one is 67 years old.
Nearby Bridges
INTERSTATE 80 WB over KINGVALE ROAD
Built 1959
INTERSTATE 80 EB over TROY ROAD
Built 1959
INTERSTATE 80 WB over TROY ROAD
Built 1959
DONNER PASS ROAD over SOUTH YUBA RIVER
Built 1929
SOUTH YUBA DR over SOUTH YUBA RIVER
Built 1925
INTERSTATE 80 EB over SOUTH YUBA RI & S YUBA D
Built 1959
INTERSTATE 80 WB over SOUTH YUBA RI & S YUBA D
Built 1959
DONNER PASS RD over INTERSTATE 80
Built 1962
INTERSTATE 80 WB over SOUTH YUBA RIVER
Built 1962
INTERSTATE 80 WB over SOUTH YUBA RIVER
Built 1962
Bridge Details
- Structure #
- 19 0107R
- Year Built
- 1959
- Length
- 33.8 m (110.9 ft)
- Max Span
- 13.4 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 13,500
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $510,000
- Total Project Cost
- $856,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.