INTERSTATE 80 WB over SOUTH YUBA RIVER

03-NEV-080-R2.69L · County 057, California · Built 1962 · 2 Lanes · 12,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
17 0073L
Year Built
1962
Length
6.7 m (22 ft)
Max Span
4.6 m
Lanes
2
Daily Traffic
12,400
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$133,000
Total Project Cost
$223,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.