RELIEF HILL RD over HUMBUG CREEK
NEAR GRANITEVILLE RD · County 057, California · Built 1952 · 1 Lanes · 27 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 8 | Very Good |
Location
39.366742, -120.899442
This bridge is in worse condition than 86.1% of bridges in County 057. The average bridge in California is 0 years old; this one is 74 years old.
Nearby Bridges
TYLER FOOTE XING over MIDDLE YUBA RIVER
Built 1958
FDR 36 over POORMAN CREEK
Built 1957
BLOOMFIELD RD over SOUTH YUBA RIVER
Built 1904
WASHINGTON RD over SOUTH YUBA RIVER
Built 1971
ROCK CREEK RD over ROCK CREEK
Built 1920
PLUMBAGO ROAD over KANAKA CREEK
Built 1985
RECTOR RD over ROCK CREEK
Built 1915
MAYBERT ROAD over CANYON CREEK
Built 2017
PURDON ROAD over SOUTH YUBA RIVER
Built 1895
PURDON ROAD over SHADY CREEK
Built 2018
Bridge Details
- Structure #
- 17C0028
- Year Built
- 1952
- Reconstructed
- 2021
- Length
- 7 m (23 ft)
- Max Span
- 6.4 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 27
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $78,000
- Total Project Cost
- $131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.