PURDON ROAD over SHADY CREEK

0.16 MI S/O TYLER FOOTE · County 057, California · Built 2018 · 2 Lanes · 613 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
17C0108
Year Built
2018
Length
18 m (59.1 ft)
Max Span
17.5 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
613
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.