INTERSTATE 80 over MYSTIC ROAD

03-NEV-080-29.49 · County 057, California · Built 1958 · 5 Lanes · 27,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
17 0064
Year Built
1958
Length
9.4 m (30.8 ft)
Max Span
8.5 m
Width
24.1 m (79.1 ft)
Lanes
5
Daily Traffic
27,000
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.