INTERSTATE 80 over TRUCKEE RIVER

03-NEV-080-27.29 · County 057, California · Built 2004 · 6 Lanes · 27,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
17 0062
Year Built
2004
Length
119.2 m (391.1 ft)
Max Span
37 m
Width
32.2 m (105.6 ft)
Lanes
6
Daily Traffic
27,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.