FARRIS RD over MAIN DRAINAGE CANAL

2 MI W/O BIGGS GRIDLEY RD · County 007, California · Built 1970 · 2 Lanes · 89 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
12C0385
Year Built
1970
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
89
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.